![]() |
New York Codes Rules Regulations (Last Updated: March 27,2024) |
![]() |
TITLE 12. Department of Labor |
![]() |
Chapter I. Industrial Board of Appeals |
![]() |
Subchapter A. The Industrial Code |
![]() |
Part 14. Construction, Installation, Inspection and Maintenance of High Pressure Boilers; Construction of Unfired Pressure Vessels |
![]() |
Subpart 14-1. Definitions |
Sec. 14-1.2. Inspection frequency
Latest version.
- No high pressure boiler shall be operated until an internal and external inspection has been made by the commissioner or an insurance company. There shall be regular inspections of every boiler subject to the provisions of this Part made at intervals no less frequent than the following:
Internal External Low Pressure Steam Boilers 3 years 2 years Low Pressure Hot Water Boilers 5 years 2 years High Pressure Steam Boilers 1 year 1 year High Pressure Hot Water Boilers 3 years 1 year
Notation
1
If equipped with manholes and handholes, an annual internal inspection is required.
2
Approximately 6 months after each internal inspection.