Sec. 14-1.2. Inspection frequency  


Latest version.
  • No high pressure boiler shall be operated until an internal and external inspection has been made by the commissioner or an insurance company. There shall be regular inspections of every boiler subject to the provisions of this Part made at intervals no less frequent than the following:
    InternalExternal
    Low Pressure Steam Boilers3 years2 years
    Low Pressure Hot Water Boilers5 years2 years
    High Pressure Steam Boilers1 year1 year
    High Pressure Hot Water Boilers3 years1 year

Notation

1
If equipped with manholes and handholes, an annual internal inspection is required.
2
Approximately 6 months after each internal inspection.