Sec. 14-1.3. Certificate of inspection  


Latest version.
  • (a) A certificate of inspection shall be issued for the operation of a boiler when the boiler is found upon inspection to comply in every respect with this Part.
    (b) No boiler shall be operated until a certificate of inspection has been issued.
    (c) The certificate of inspection shall be conspicuously posted under glass in the boiler room or the engine room. The certificate of inspection for a portable boiler shall be on the premises where the boiler is being operated and shall be available at all times.