![]() |
New York Codes Rules Regulations (Last Updated: March 27,2024) |
![]() |
TITLE 12. Department of Labor |
![]() |
Chapter I. Industrial Board of Appeals |
![]() |
Subchapter A. The Industrial Code |
![]() |
Part 56. Asbestos |
![]() |
Subpart 56-4. General Project Air Sampling and Laboratory Analysis Requirements |
12 CRR-NY I A 56-4 Notes |
Sec. 56-4.1. Qualifications of air sampling personnel |
Sec. 56-4.2. Laboratory certification |
Sec. 56-4.3. Independent third party sampling and analysis |
Sec. 56-4.4. Asbestos contractors allowed to perform project air sampling on an asbestos project |
Sec. 56-4.5. Air sample log |
Sec. 56-4.6. Test methods |
Sec. 56-4.7. Air sampling equipment |
Sec. 56-4.8. Area air sample analysis and results—general requirements |
Sec. 56-4.9. Number and location of samples required |
Sec. 56-4.10. Work stoppage criteria during Phases II A through II C |
Sec. 56-4.11. Phase II C satisfactory clearance air sample results criteria |
Sec. 56-4.12. Unsatisfactory clearance air sample results |