![]() |
New York Codes Rules Regulations (Last Updated: March 27,2024) |
![]() |
TITLE 12. Department of Labor |
![]() |
Chapter I. Industrial Board of Appeals |
![]() |
Subchapter A. The Industrial Code |
![]() |
Part 56. Asbestos |
![]() |
Subpart 56-7. Phase II A: Work Area Preparation |
12 CRR-NY I A 56-7 Notes |
Sec. 56-7.1. Air sampling requirements |
Sec. 56-7.2. Materials and equipment |
Sec. 56-7.3. Asbestos abatement contractor daily project log |
Sec. 56-7.4. Establishing each regulated abatement work area |
Sec. 56-7.5. Personal and waste decontamination system enclosures |
Sec. 56-7.6. Personal protective equipment (PPE) |
Sec. 56-7.7. Electric power |
Sec. 56-7.8. Engineering controls |
Sec. 56-7.9. Heating, ventilation, and air conditioning (HVAC) systems |
Sec. 56-7.10. Regulated abatement work area pre-cleaning |
Sec. 56-7.11. Regulated abatement work area enclosure |