Transmission Pipeline Integrity Management


Sec. 255.901. Scope
Sec. 255.903. Definitions
Sec. 255.905. High consequence areas
Sec. 255.907. General
Sec. 255.909. Changes to an integrity management program
Sec. 255.911. Required elements
Sec. 255.913. Deviation from the requirements of this Part
Sec. 255.915. Knowledge and training
Sec. 255.917. Identification of potential threats to pipeline
Sec. 255.919. Baseline assessment plan
Sec. 255.921. Conducting a baseline assessment
Sec. 255.923. Direct assessment
Sec. 255.925. External corrosion direct assessment (ECDA)
Sec. 255.927. Internal corrosion direct assessment (ICDA)
Sec. 255.929. Direct assessment for stress corrosion cracking (SCCDA)
Sec. 255.931. Confirmatory direct assessment (CDA)
Sec. 255.933. Addressing integrity issues
Sec. 255.935. Preventive and mitigative measures to protect the high consequence areas
Sec. 255.937. Continual process of evaluation and assessment
Sec. 255.939. Reassessment intervals
Sec. 255.941. Low stress reassessment
Sec. 255.943. Deviation from reassessment intervals
Sec. 255.945. Measuring program effectiveness
Sec. 255.947. Records
Sec. 255.949. Notification requirements
Sec. 255.951. Reporting requirements
Sec. 255.1001. Definitions that apply to sections 255.1003 through 255.1015 of this Part
Sec. 255.1003. General requirements of a GDPIM plan
Sec. 255.1005. Implementation requirements of a GDPIM plan
Sec. 255.1007. Required elements of a GDPIM plan
Sec. 255.1009. Required report when compression couplings fail
Sec. 255.1011. Records an operator must keep
Sec. 255.1013. Deviations from required periodic inspections
Sec. 255.1015. GDPIM plan requirements for a master meter or a small liquefied petroleum gas (LPG) operator