New York Codes Rules Regulations (Last Updated: March 27,2024) |
TITLE 16. Department of Public Service |
Chapter III. Gas Utilities |
Subchapter C. Safety |
Part 255. Transmission and Distribution of Gas |
Transmission Pipeline Integrity Management |
Sec. 255.901. Scope |
Sec. 255.903. Definitions |
Sec. 255.905. High consequence areas |
Sec. 255.907. General |
Sec. 255.909. Changes to an integrity management program |
Sec. 255.911. Required elements |
Sec. 255.913. Deviation from the requirements of this Part |
Sec. 255.915. Knowledge and training |
Sec. 255.917. Identification of potential threats to pipeline |
Sec. 255.919. Baseline assessment plan |
Sec. 255.921. Conducting a baseline assessment |
Sec. 255.923. Direct assessment |
Sec. 255.925. External corrosion direct assessment (ECDA) |
Sec. 255.927. Internal corrosion direct assessment (ICDA) |
Sec. 255.929. Direct assessment for stress corrosion cracking (SCCDA) |
Sec. 255.931. Confirmatory direct assessment (CDA) |
Sec. 255.933. Addressing integrity issues |
Sec. 255.935. Preventive and mitigative measures to protect the high consequence areas |
Sec. 255.937. Continual process of evaluation and assessment |
Sec. 255.939. Reassessment intervals |
Sec. 255.941. Low stress reassessment |
Sec. 255.943. Deviation from reassessment intervals |
Sec. 255.945. Measuring program effectiveness |
Sec. 255.947. Records |
Sec. 255.949. Notification requirements |
Sec. 255.951. Reporting requirements |
Sec. 255.1001. Definitions that apply to sections 255.1003 through 255.1015 of this Part |
Sec. 255.1003. General requirements of a GDPIM plan |
Sec. 255.1005. Implementation requirements of a GDPIM plan |
Sec. 255.1007. Required elements of a GDPIM plan |
Sec. 255.1009. Required report when compression couplings fail |
Sec. 255.1011. Records an operator must keep |
Sec. 255.1013. Deviations from required periodic inspections |
Sec. 255.1015. GDPIM plan requirements for a master meter or a small liquefied petroleum gas (LPG) operator |