New York Codes Rules Regulations (Last Updated: March 27,2024) |
TITLE 6. Department of Environmental Conservation |
Chapter V. Resource Management Services |
Subchapter E. Water Regulation |
Part 606. Use, Operation and Maintenance of Great Sacandaga Lake (Formerly the Sacandaga Reservoir) |
Access Rules |
Fees and Charges |
Sec. 606.65. Fees or charges for engineering services
Latest version.
- (a) Each applicant for a permit shall pay to the board, at the time of filing the application therefor, the following named charges or fees for engineering service to be rendered by the board in case of the granting and issuance of a permit:(1) the basic survey fee where the access area applied for does not exceed 100 feet in width; and(2) the supplemental survey fee, in addition to the basic survey fee, for each additional 100 feet in width of access area, or fractional part thereof, for which application is made.(b) Each permittee requesting a new survey to be made of an access area shall pay to the board the basic survey fee.(c) Each said applicant shall pay in addition to the foregoing, at the time of filing application for permit, the basic application clerical fee to defray clerical and other incidental expenses in connection with the application and the basic sign fee as payment for one sign to be furnished and erected on the access area by the board.(d) The said charges or fees shall be refunded in case of nonissuance of permit. The charges or fees specified in this section are not required to be paid upon renewal of permit, excepting as prescribed in section 606.69 of this Part.(e) Fee for work project.