LPA-41-16-00009-P Authority's Smart Grid Small Generator Interconnection Procedures  

  • 10/12/16 N.Y. St. Reg. LPA-41-16-00009-P
    NEW YORK STATE REGISTER
    VOLUME XXXVIII, ISSUE 41
    October 12, 2016
    RULE MAKING ACTIVITIES
    LONG ISLAND POWER AUTHORITY
    PROPOSED RULE MAKING
    HEARING(S) SCHEDULED
     
    I.D No. LPA-41-16-00009-P
    Authority's Smart Grid Small Generator Interconnection Procedures
    PURSUANT TO THE PROVISIONS OF THE State Administrative Procedure Act, NOTICE is hereby given of the following proposed rule:
    Proposed Action:
    The Long Island Power Authority proposes to update the Authority's Smart Grid Small Generator Interconnection Procedures, which is an addendum to the Authority's Tariff, to reflect updates to the NY Standardized Interconnection Procedures.
    Statutory authority:
    Public Authorities Law, section 1020-f(u) and (z)
    Subject:
    Authority's Smart Grid Small Generator Interconnection Procedures.
    Purpose:
    To update the Authority's Smart Grid Small Generator Interconnection Procedures.
    Public hearing(s) will be held at:
    10:00 a.m., Nov. 28, 2016 at H. Lee Dennison Bldg., 100 Veterans Memorial Hwy., Hauppauge, NY; and 2:00 p.m., Nov. 28, 2016 at Long Island Power Authority, 333 Earle Ovington Blvd., 4th Fl., Uniondale, NY.
    Interpreter Service:
    Interpreter services will be made available to hearing impaired persons, at no charge, upon written request submitted within reasonable time prior to the scheduled public hearing. The written request must be addressed to the agency representative designated in the paragraph below.
    Accessibility:
    All public hearings have been scheduled at places reasonably accessible to persons with a mobility impairment.
    Substance of proposed rule:
    The Long Island Power Authority Staff proposes to modify the PSEG-Long Island Smart Grid Small Generator Interconnection Procedures (“Smart Grid SGIP”), which is an addendum to the Tariff for Electric Service in order to reflect the March 2016 updates made to New York State Standardized Interconnection Requirements and Application Process for New Distributed Generators 5 MW or Less Connected in Parallel with Utility Distribution Systems (“SIR”) and to provide for implementation of the Online Application Portal required by the SIR.
    Text of proposed rule and any required statements and analyses may be obtained from:
    Justin Bell, Long Island Power Authority, 333 Earle Ovington Blvd., Suite 403, Uniondale, NY 11553, (516) 719-9886, email: jbell@lipower.org
    Data, views or arguments may be submitted to:
    Same as above.
    Public comment will be received until:
    Five days after the last scheduled public hearing.
    Regulatory Impact Statement, Regulatory Flexibility Analysis, Rural Area Flexibility Analysis and Job Impact Statement
    Statements and analyses are not submitted with this notice because the proposed rule is within the definition contained in section 102(2)(a)(ii) of the State Administrative Procedure Act.

Document Information