New York Codes Rules Regulations (Last Updated: March 27,2024) |
![]() |
TITLE 12. Department of Labor |
![]() |
Chapter I. Industrial Board of Appeals |
![]() |
Subchapter A. The Industrial Code |
![]() |
Part 56. Asbestos |
![]() |
Subpart 56-4. General Project Air Sampling and Laboratory Analysis Requirements |
Sec. 56-4.8. Area air sample analysis and results—general requirements
Latest version.
- (a) Turnaround time.For project air samples collected during the asbestos project, the period of time permitted between completion of air sample collection and receipt of results on the job site shall be equal to or less than 48 hours.(b) Microscope detail.The methodology chosen for sampling, analysis, and the microscope type, make, and model number shall be included in the results.(c) Sample records.All project air samples shall have a chain of custody.